top of page
Electrician

Terms & Conditions

1. Installation Work:

a) All electrical installation work will comply with BS7671: 2018 and any amendments in force at the time of the works.
b) All electrical installation work will comply with applicable Building Regulations in force at the time of the works.
c) Where work is to extend or modify existing circuits, costs quoted assume that the existing installation is in adequate condition and complies with minimum current regulations. Any works found required to bring the necessary parts of the existing installation up to standard will be at additional cost.

d) Unless stated otherwise, all cables will be concealed by chasing into the building fabric or concealed in building voids, under floors, etc. Where impracticable, cabling will be neatly surface run, either clipping direct or housed in trunking / conduit. e) Where carpet or flooring coverings may require lifting to allow concealed installation work, no charge is made for this service, with best endeavours being made to avoid damaging them and to refit them to an acceptable standard. However, consideration of employing a specialist fitter may be prudent, at your cost to affect a fully satisfactory reinstatement.

f) Where agreed beforehand, chases to walls, etc will be re-filled to 2mm below plaster finish depth, however final finishing of skim coat plaster and final decoration is excluded.
g) All endeavours will be made to undertake installation work to a clean standard, using dustsheets and vacuum cleaning equipment as necessary.

h) The contract outlines the expected duration of the installation work.
i) Whilst undertaking the installation work at the property, the client is required to provide water and power free of charge

2. Exclusions:

a) Clearing and / or moving of furniture and other items blocking access to work areas are not included.
b) Except where detailed, builders work (creating of holes larger than 50mm diameter, creating of support structures, etc) are not included, except as outlined in 1d, e and f above.
c) Re-decoration and final making good are excluded from quoted costs, unless specifically detailed as included.
d) Removal from site and disposal of rubble, fittings, wiring, materials, general waste and packaging is not included.

3. Extras and Variations:

a) All extras and variations must be agreed in writing prior to commencement.


4. Pricing:

a) The costs quoted assume continuous and unhindered access to the site by prior arrangement with you.
b) Unless stated otherwise, the costs quoted assume standard working hours between the hours of 08:00 hrs – 17:00 hrs Monday to Friday. Work required outside these hours may attract out of hours premium rates.

c) Any additional work not covered in our quoted costs will attract additional time charge rate to be discussed plus materials cost.
d) All figures quoted are subject to VAT at the prevailing rate.
e) All figures quoted are valid for a date of 30 days from the date of the quotation.

5. Deviations from Building Regulations and BS7671:

a) All work where applicable, will be executed fully in compliance with applicable Building Regulations and BS7671 in force at the time of the work, particularly in respect of work in dwellings to allow the legal Part P obligations to be met. Where a Client requires deviation from such regulations, a written instruction and record will be required.

6. Risk and Title of Goods and Property:
a) The risk in all goods supplied shall pass to the Client upon delivery.
b) All goods supplied shall remain property of Mirzo Ltd until all sums due have been paid in full.
c) The client is responsible for ensuring that the property is insured for the duration of the installation work.


7. Warrantee:
a) Mirzo Ltd warrants its installation work to be defect free for a period of twelve months from invoice date. Such cover does not extend to goods not supplied by Mirzo Ltd, physical damage to products, or any instance where the original installation has been altered or tampered with subsequently by third parties.


8. Payment:
a) Unless agreed in writing payment in full must be made on completion of the specified works to Mirzo Ltd.
b) Stage payments will be requested by prior arrangement where planned works take longer than 10 days. We reserve the right to request from you stage payments in the instance where works take longer than 5 days.
c) 25% Deposit is required before any materials are ordered.


9. Complaints Policy
a) The business always endeavours to provide the best service.  However, on rare occasions there may be times where a customer may not be completely satisfied. 

To ensure the business can put things right for you, as soon as possible after the completion of the works, please inspect the work to ensure everything has been carried out based on the contract terms and to the high standards the business aims to achieve.

Please contact the business straight away with any concerns either by phone, email or write to us. If writing, get proof of posting.

b) Business Complaint Procedure

On receipt of your complaint the business aims to respond within 5 days.  

The business will arrange a convenient date to come and view and/or remedy the situation within 28 days.

In the unlikely event the business is unable to resolve your complaint having exhausted the business complaints procedure, it may be necessary to use another complaint service.  Where the business cannot resolve the complaint to your satisfaction and/or agree to the final resolution requests confirmed to us; and both parties agree a ‘deadlock’ has been reached, you can then escalate your complaint.

The business has access to an Alternative Dispute Resolution (ADR) service for our domestic installation, service, repair and maintenance contracts as part of the Which? Trusted Traders Endorsement.  If you choose to you can refer your complaint to Which? Trusted Traders’ Alternative Dispute Resolution.  You will need to contact Which? Trusted Traders on 02922 670 040 who can explain if you are eligible to use their Alternative Dispute Resolution.

bottom of page